Project Location:  Northeast corner of US Hwy 45, S. Fairway Drive and N. Buffalo Grove Road.

Project Description:  This drinking water reservoir provides 500,000 gallons of water storage to more than 25,000 residents and area businesses in the Vernon Hills Water System.  Due to the age of the structure, rehabilitation and modernization is needed to prolong the life of this asset.  The project may include roof replacement, installation of interior mixing equipment, interior/exterior painting, and other related improvements.  Previous electrical and mechanical upgrades were completed at this facility.

Project Images

  1. 1

Current Phase/Anticipated Schedule:

A needs evaluation is underway to identify the needed improvements.  Design and construction are anticipated to occur within the current Five-Year Capital Program.

  1. Project Contact
  2. Project Documents

Marc Bourgault, P.E.
Principal Engineer
847-377-7500
[email protected]