Gages Lake Road Water Main Upsizing

Project Location:  Along Gages Lake Rd from Route 45 to W Dady Ct and from Winnebago Dr to N Gagewood Ln in the Wildwood area

Project Description:  Replace 4,600 feet of 8- and 10-inch water main with 8- and 12-inch water main to help increase water pressure and replace aging pipe.

Project Images

  1. 1
  2. 2
  3. 3
  4. 4
  5. 5
  6. 6
  7. 7
  8. 8
  9. 9

Current Phase/Anticipated Schedule:

 Design is underway, and construction is anticipated to begin in 2025. 

  1. Project Contact
  2. Project Documents

Jeremy Kim
Civil Engineer
847-377-7500
[email protected]