Gages Lake Road Water Main Upsizing

Project Location:  Along Gages Lake Rd from Route 45 to W Dady Ct in the Wildwood area

Project Description:  Replace 2,600 feet of 8- and 10-inch water main with 12-inch water main to help increase water pressure.

Project Images

  1. 1
  2. 2
  3. 3
  4. 4
  5. 5

Current Phase/Anticipated Schedule:

Design is underway, and construction is anticipated to occur within the current Five-Year Capital Program.