Grandwood Park Water Main Replacement

Project Location:  Edgewood Drive, Lee Circle, Woodland Terrace, and Grandwood Drive within the Grandwood Park Subdivision in Gurnee, Warren Township.

Project Description:  Replacement of approximately 4,600 linear feet of watermain that has reached the end of its service life and has experienced several water main breaks.

Project Images

  1. 1
  2. 2
  3. 3
  4. 4
  5. 5
  6. 6

Current Phase/Anticipated Schedule:

Design is underway, and construction is anticipated to occur in 2024.