Wildwood and Allen Farms Water Main Replacement

Project Locations: 

  • Big Oaks Road from N. Mill Road to N. Battershall Road. 
  • Valley View Drive from Old Plank Road to Willow Point Drive.
  • Valley View Drive from N. Park Street to N. Sunset Avenue
  • N. Greentree Road from W. Valley Drive To N. Mill Road
  • Various roads in the Allen Farms Subdivision within the Wildwood area


Project Description: Replacement of approximately 7,200 feet of water main pipe that is up to 50 years old and has reached the end of its service life. Over the years, these water main pipes have experienced several water main breaks. The current pipes are of a variety of sizes and materials. The new water main pipe will increase the reliability of service for the years to come.   

During construction, residents will observe open trench construction, truck traffic, construction noise and daytime lane closures. Temporary water service shutdowns will be required in some areas, and customer notification will be provided

Project Images

  1. 1
  2. 2
  3. 3
  4. 4
  5. 5
  6. 6
  7. 7

Current Phase/Anticipated Schedule:

In 2023 construction is anticipated to be substantially complete on Big Oaks Road, Greentree Road and Valley View Drive. In the spring of 2024, additional restoration work will occur in these areas, and construction will begin in Allen Farms, as well. Final restoration may occur in the fall of 2024.

  1. Project Contact
  2. Project Documents

Jeremy Kim
Civil Engineer
847-377-7500
[email protected]