Oak Terrace Well House and System Interconnection (ARPA Funded)

Project Location: Southeast corner of West Oak Middle School property in unincorporated Mundelein/Long Grove area. 

Project Description: Construction of a new wellhouse on the West Oak Middle School, which will serve the school and the Oak Terrace Water System in the nearby neighborhood. This is the final phase of a project that began with drilling a test well and installing new water main pipes. With this project, the recently installed mains will become operational, and LCPW will work with water system residents to install water meters.  

All improvements are intended to be 100% funded by ARPA. Should project costs exceed the $2.5 million awarded, Lake County Public Works ratepayer dollars will be applied to the project.

Project Images

  1. 1

Current Phase/Anticipated Schedule:

Design is underway, and the construction contract is anticipated to be awarded in the summer of 2023.  Construction is anticipated to be complete by the end of 2024.  

  1. Project Contact
  2. Project Documents

Jeremy Kim 
Civil Engineer
847-377-7500
[email protected]