Lakeside Force Main Replacement

Project Location: Lakeside Drive in unincorporated Avon Township.   

Project Description: Replacement of more than 1,000 linear feet of 6 inch diameter force main that has reached the end of its service life.  

Project Images

  1. 1
  2. 2
  3. 3

Anticipated Schedule

This project is under design with the construction timeline to be determined.  

  1. Project Contact
  2. Project Documents

Ying Miao, P.E.
Principal Civil Engineer
847-377-7500
publicworks@lakecountyil.gov