Jackson Force Main Replacement

Project Location: Jackson Drive in unincorporated Grant Township.  

Project Description: Replacement of 500 linear feet of 4-inch diameter cast iron pipe force main that has reached the end of its service life.  

Project Images

  1. 1
  2. 2
  3. 3

Anticipated Schedule

Design is underway, and construction is anticipated to occur within the current Five-Year Capital Program. 

  1. Project Contact
  2. Project Documents

Ying Miao, P.E.
Principal Civil Engineer
847-377-7500
[email protected]