New Century Town Water Reclamation Facility Bar Screen Equipment Replacement

Project Location:  Located in the pretreatment building at the New Century Town Water Reclamation Facility in Vernon Hills.   

Project Description:  This project will replace the existing bar screen equipment that has reached the end of its useful life. Bar screens capture and remove some materials from wastewater flowing into the water reclamation facility, allowing the wastewater to continue on in the treatment process. The screens empty the captured material onto a conveyor which transports the screenings to a dumpster for proper disposal.

Project Images

  1. 1
  2. 2
  3. 3
  4. 4

Current Phase/Anticipated Schedule:

This project is under concept design and final design in 2021, with construction anticipated in 2022.

  1. Project Contact
  2. Project Documents

Tom Miles, P.E.  
Principal Civil Engineer 
847-377-7500 
publicworks@lakecountyil.gov