Project Location: Residential side yards between Hilltop Rd. and Oak Grove Dr. in Long Grove.
Project Description: Replacement of 500-feet of 4-inch diameter force main conveying wastewater from the Briarcrest Subdivision. The 30-year-old pipe has signs of corrosion and a history of breaks. The new pipe will be modern in material and installation, resulting in infrastructure that will last another 50+ years.