Columbia Bay Road Force Main Replacement

Project Location: Columbia Bay Road in unincorporated Lake Villa Township.   

Project Description:  Replacement of nearly 2,000-feet of 8-inch diameter force main conveying wastewater from neighborhoods along Petite Lake and Fox Lake. The existing pipe is more than 40 years old and requires replacement with a modern pipe material, resulting in infrastructure that will last another 50+ years. Improved performance will result in fewer breaks and failures.   

Project Images

  1. 1
  2. 2
  3. 3

Current Phase/Anticipated Schedule:

Design is underway, and construction is anticipated to occur within the current Five-Year Capital Program.  

  1. Project Contact
  2. Project Documents

Emily Karry, P.E.  
Capital Improvement Program Manager 
847-377-7500 
[email protected]