Highland Lake Water System Concept Study

Project Location:  Subdivision west of Highland Lake in unincorporated Avon Township.   

Project Description:  Study of options to modernize the Highland Lake water system, which may include bringing storage tanks above ground, water main replacement, system expansion or a change in water source to Lake Michigan water. The study will determine any next steps.   

Project Images

  1. 1
  2. 2
  3. 3
  4. 4

Current Phase/Anticipated Schedule:

Water system assessment in 2021 to determine any next steps.  

  1. Project Contact
  2. Project Documents

Chuck DeGrave, P.E.
Principal Civil Engineer 
847-377-7500 
publicworks@lakecountyil.gov