Buffalo Grove Rd - From IL Rte 22 to Deerfield Pkwy
Crews will also connect the bike path gap between Aptakisic Road and Brandywyn Lane making it easier for residents to walk and bike to local parks, schools and shopping areas.
No road closures are expected; one lane of traffic will be open in each direction. Temporary lane closures may occur a few hours per day to complete major work.
Early in 2022, LCDOT asked the community for input on this project. Visit the project's virtual public forum page to see what the community said about the project.
Construction is taking place over a two-year period using a staged approach:
North Section: Focused construction on Buffalo Grove Road from IL22 to Aptakisic Road, with minor impacts south of Aptakisic.
South Section: Focused construction on Buffalo Grove Road from Aptakisic Road to Deerfield Pkwy. This includes intersection improvements at Buffalo Grove Road and Aptakisic Road, which will extend to slightly north of Aptakisic.
Current Information
5/9/2022 - The new traffic signals at the intersection of Thompson Blvd and Buffalo Grove Rd have been turned on. Median trees have been planted and landscape restoration work is in progress. Sidewalk work for the proposed crosswalk on Buffalo Grove Rd just south of Brandywyn Ln has been completed. The crosswalk will remain closed until posts and flashing beacons are installed (waiting on material delivery) and crosswalk is striped.
This week, crews plan on completing bike path on the east side of Buffalo Grove Rd south of Brandywyn near the proposed crosswalk and other miscellaneous asphalt items. They will also work on landscape restoration work and other punch list items.
Traffic Impacts: Watch for workers and flaggers and be aware of daily lane closures while crews are working on punch list items..
Project Images
-
Signals at Thompson
-
Finished sidewalk for crosswalk
-
Landscaping along Thompson
-
Tree planting Buffalo Grove Rd median
-
Landscape restoration Buffalo Grove Rd (Dec 2021)
-
Striped crosswalk Aptakisic/Buffalo Grove Rd (Dec 2021)
-
Lanes open Buffalo Grove Rd (Dec 2021)
-
Lanes open Buffalo Grove Rd (Dec 2021)
-
Paving surface Aptakisic/Buffalo Grove Rd (Nov 2021)
-
Concrete median-paving east leg (Nov 2021)
-
Paving surface east leg Aptakisic (Nov 2021)
-
Pouring sidewalk at Larraway (Nov 2021)
-
Paving bike path Aptakisic-Buffalo Grove Rd (Nov 2021)
-
Paving intersection Aptakisic/Buffalo Grove Rd (Nov 2021)
-
Installing mast arms on Thompson (Nov 2021)
-
Placing concrete curb Buffalo Grove Rd median (Nov 2021)
-
Seed and blanket Buffalo Grove Rd medians (Nov 2021)
-
Installing storm sewer Buffalo Grove Rd median (Nov 2021)
-
Pouring concrete median curb Aptakisic (Nov 2021)
-
Stage 3 traffic to outside lanes Buffalo Grove Rd (Oct 2021)
-
Median work at intersection (Oct 2021)
-
Storm sewer in Buffalo Grove Rd median (Oct 2021)
-
Pavement removal median Buffalo Grove Rd (Oct 2021)
-
Installing drainage structure at intersection (Oct 2021)
-
Excavating stage C pavement (Oct 2021)
-
Paving and compacting stage 2C binder (Oct 2021)
-
Demo and sawcut pavement stage 2D (Oct 2021)
-
Striping for stage 2C traffic switch (Oct 2021)
-
Pouring light pole foundation at Larraway (Oct 2021)
-
Pouring sidewalk near Lasalle Ln (Oct 2021)
-
Pavement removal Buffalo Grove Rd (Oct 2021)
-
PGE looking south at BG-Aptakisic (Oct 2021)
-
New sidewalk on Aptakisic (Oct 2021)
-
Applying joint sealant on Aptakisic (Oct 2021)
-
Paving Aptakisic Rd west of Buffalo Grove Rd (Oct 2021)
-
Paving on Buffalo Grove Rd (Sept 2021)
-
Pavement binder at Larraway (Sept 2021)
-
Installing storm sewer (Sept 2021)
-
Grade capping aggregate on Buffalo Grove Rd (Sept 2021)
-
Forming curb on Buffalo Grove Rd (Sept 2021)
-
Subgrade excavation on Aptakisic Rd (Sept 2021)
-
Crane for Directional Boring (Sept 2021)
-
Pit and Machine to Directional Bore Pipe Casing (Sept 2021)
-
Pipe Casing with Augur (Sept 2021)
-
Placing storm sewer structure Aptakisic Rd (August 2021)
-
PGE roller compaction on Buffalo Grove Rd (August 2021)
-
Asphalt removal grinding (August 2021)
-
Concrete pavement breaker near Thompson (August 2021)
-
Backfilling Buffalo Grove Rd box culvert (August 2021)
-
Landscape restoration near Thompson (August 2021)
-
Placing PGE road base near Aptakisic (August 2021)
-
Striping stop bar for Stage 2 (August 2021)
-
Placing pavement markings for Stage 2 (August 2021)
-
Placing tape markings for Stage 2 (August 2021)
-
Pouring curb at plaza entrance (August 2021)
-
Pouring concrete traffic signal foundation at Thompson (August 2021)
-
Joint sealant and compaction of new pavement (July 2021)
-
Paving across LaSalle (July 2021)
-
Placing waterproof membrane (July 2021)
-
Storm sewer Installation Aptakisic-BG Rd (July 2021)
-
Finishing concrete curb (July 2021)
-
Compacting asphalt on Buffalo Grove Rd (July 2021)
-
Curb pour near Thompson (July 2021)
-
Installing storm sewer near Aptakisic Rd box culvert (July 2021)
-
Pipe puller box culvert (July 2021)
-
Box culvert precast end section (July 2021)
-
Placing capping aggregate south of Thompson (June 2021)
-
Installing storm sewer laterals on Aptakisic (June 2021)
-
Removing Aptakisic pavement (June 2021)
-
Pavement removal - Aptakisic (June 2021)
-
Box culvert install - phase 2 (June 2021)
-
Installing waterpoof membrane - phase 2 (June 2021)
-
Placing temporary pavement over box culvert (June 2021)
-
Striping for stage 1 traffic switch (June 2021)
-
Placing temporary pavement over box culvert (June 2021)
-
Rip rap installed at box culvert (June 2021)
-
Framing box culvert wingwall (May 2021)
-
Pouring culvert wingwall (May 2021)
-
Box culvert wingwall (May 2021)
-
Placing PGE road base near Laraway (May 2021)
-
Compacting PGE stone (May 2021)
-
Setting 1st section of box culvert (May 2021)
-
Framing box culvert concrete collar (May 2021)
-
Laying out pavement striping near school (May 2021)
-
Marking the turn lane (May 2021)
-
Joint sealing (May 2021)
-
Paving surface near Birchwood (May 2021)
-
Paving surface near Banyan Tree (May 2021)
-
Placing rebar for culvert footing (May 2021)
-
Paving bike path across park (May 2021)
-
Sod and tree planting (May 2021)
-
Installing storm sewer south of Aptakisic (April 2021)
-
Landscape restoration in median (April 2021)
-
Placing stone base for bikepath (April 2021)
-
Placing light pole at Birchwood (April 2021)
-
Placing temporary pavement south of Thompson (April 2021)
-
Replacing damaged curb near park entrance (March 2021)
-
Pouring sidewalk north side of park entrance (March 2021)
-
Installing silt fence south side Aptakisic (March 2021)
-
Installing temporary signals (March 2021)
-
Temporary erosion blanket and hydromulch (December 2020)
-
Lanes open - Banyan Tree (December 2020)
-
Lanes open - Birchwood (December 2020)
-
Lanes open - north of Aptakisic (December 2020)
-
Striping pavement n of Birch (December 2020)
-
Placing concrete median near IL22 (December 2020)
-
Pour sidewalk at Satinwood (December 2020)
-
Constructing road base at IL22 (November 2020)
-
Median curb near IL22 (November 2020)
-
New sidewalk between school entrances (November 2020)
-
Compacting asphalt at south school driveway (November 2020)
-
Concrete pavement demolition near IL22 (November 2020)
-
Pavement striping near school entrance (November 2020)
-
Compacting asphalt near Churchill Park (November 2020)
-
Paving near Churchill Park (November 2020)
-
Pouring concrete sidewalk at school entrance (November 2020)
-
Augering for light pole foundations (November 2020)
-
Placing joint sealant near IL22 (November 2020)
-
Paving looking south from Birchwood
-
Pour concrete curb looking south near Brandywyn
-
Pouring curb at Birchwood (October 2020)
-
Checking grades for new road base (October 2020)
-
Place capping aggregate south of Birchwood (October 2020)
-
pour curb s. of RT 22 looking south
-
storm sewer near Churchill Park looking north
-
Compacting storm sewer trench near IL22 (October 2020)
-
Relocated fire hydrant at Satinwood (October 2020)
-
Pouring sidewalk at Banyan Tree (October 2020)
-
Installing storm sewer near Birchwood (October 2020)
-
Installing manhole at school entrance (October 2020)
-
Pavement removal at Brandywyn (October 2020)
-
Storm sewer near Churchill Park (October 2020)
-
Hammering to remove reinforced pavement (September 2020)
-
Pavement removal looking south just south of Brandywyn
-
Removing temporary pavement near Churchill Park (September 2020)
-
Removing temporary pavement north of Aptakisic (September 2020)
-
Prep for stage 2: removing existing pavement markings (September 2020)
-
New traffic pattern for stage 2 (September 2020)
-
Breaking up concrete pavement at Brandywyn (September 2020)
-
Installing temporary light pole at Satinwood (August 2020)
-
Concrete pour for hand holes near Satinwood (August 2020)
-
Concrete pour for sidewalk near IL22 (August 2020)
-
Concrete pour for light pole foundations (August 2020)
-
Applying joint sealant near Satinwood (August 2020)
-
Paving south of Brandywyn (August 2020)
-
Pouring curb at Brandywyn (August 2020)
-
Fine grade capping aggregate (August 2020)
-
Paving 1st lift (August 2020)
-
Machine-forming new curb (July 2020)
-
Capping aggregate placement near IL22 (July 2020)
-
PGE placement at Banyan Tree (July 2020)
-
Placed grindings looking north near Aptakisic (Jul 2020)
-
Jackhammered concrete looking south at box culvert (Jul 2020)
-
PGE placement south of Brandywyn (Jul 2020)
-
Storm sewer work north of Banyan Tree (Jul 2020)
-
Subgrade excavation looking north (July 2020)
-
Storm sewer installation at Banyan Tree (July 2020)
-
Satinwood east access looking west (June 2020)
-
Storm sewer installation at Brandywyn east (June 2020)
-
Light pole removal looking north Satinwood east (June 2020)
-
Existing concrete pvmt removal between Banyan and Birchwood looking south (June 2020)
-
Break CRC pavement near Birchwood (June 2020)
-
Excavation work east side BG Rd (June 2020)
-
Excavation work looking north (June 2020)
-
Breaking concrete pavement looking north (June 2020)
-
Stage 1 traffic pattern looking north (June 2020)
-
Pavement striping near school (June 2020)
-
Placing temporary pavement BG Rd (June 2020)
-
Concrete removal in median (June2020)
-
Excavation grading median south of IL22 (June2020)
-
Storm sewer work in median north of Aptakisic (June2020)
-
Temp pvmt - blanket looking south (May 2020)
-
Placing temp pvmt looking north (May 2020)
-
Placing temp pavement w.side BG Rd (May 2020)
-
Excavating for temp pavt looking south (May 2020)
-
Tree removal looking SE (May 2020)
-
Silt fence looking north (May 2020)
-
Buffalo Grove Rd existing conditions (Mar2020)
-
Buffalo Grove Rd existing conditions (Mar2020)
-
Buffalo Grove Rd existing conditions (Mar2020)
-
Buffalo Grove Rd existing conditions (Mar2020)
-
Project location
Revised Project Exhibits (including intersection improvement at Aptakisic Rd)
Public Meeting Exhibits:
- Buffalo Grove Rd - CRASH DATA (PDF)
- Buffalo Grove Rd - ENVIRONMENTAL RESOURCES (PDF)
- Buffalo Grove Rd - EXISTING V. PROPOSED - ALL (PDF)
- Buffalo Grove Rd - PROJECT SCHEDULE PUBLIC HEARING (PDF)
- Buffalo Grove Rd - PUBLIC HEARING HANDOUT (PDF)
- Buffalo Grove Rd - ROW EXHIBIT PUBLIC HEARING (PDF)
- Buffalo Grove Rd - STRIP MAP (PDF)
- Buffalo Grove Rd - TRAFFIC VOLUME (PDF)
- Buffalo Grove Rd - TYP CROSS SECTION - EXISTING (PDF)
- Buffalo Grove Rd - TYP CROSS SECTION - PROPOSED (PDF)
Matt Mitchell, Resident Engineer
Lake Division of Transportation
600 West Winchester Road
Libertyville, IL 60048-1381
[email protected]
(847) 383-6676
4/11/2022 - Crews are looking to start work on punch list items this week. The remaining punch list items to be completed include shaping ditches, replace damaged sidewalk and asphalt, landscape restoration work at various locations, tree installation in the medians south of Aptakisic Rd, complete pavement markings, permanent traffic signal turn on at Thompson Blvd and other miscellaneous clean up work throughout the site. Also, crews will be working on the Rectangular Rapid Flashing Beacons for the proposed pedestrian crosswalk on Buffalo Grove Rd just south of Brandywyn Ln
12/3/2021 - All lanes now open. Thank you for your patience! Crews have completed pavement striping and landscape restoration in progress. For week of 12/6, crews plan to paint nose medians, finish landscape restoration, remove barricades and complete miscellaneous clean up work.
11/29/2021 - Crews have completed asphalt paving and landscape restoration is in progress. This week, crews will continue landscape restoration and begin pavement striping.
11/19/2021 - The bike path on the east side of Buffalo Grove Rd north of Aptakisic Rd has been completed. Final paving and sidewalk construction is in progress, and should be completed by Thanksgiving weekend. For week of 11/22, crews will continue road paving, concrete median work and landscape restoration.
11/11/2021 - Concrete curb and gutter installation, road base grading and landscape restoration in progress. Paving to begin tomorrow (11/12). For week of 11/15, crews will continue paving, landscape restoration and miscellaneous clean up work.
11/5/2021 - Storm sewer and concrete curb and gutter construction for the median areas in progress. For week of 11/8, contractor plans to begin asphalt paving for the final stage. Also, crews will work on landscape restoration and sidewalk construction.
10/29/2021 - The stage 3 traffic pattern is now in place. Traffic has been shifted to the outside lanes so crews can work on the final stage (median construction). Underground drainage installation and pavement removal in the medians is in progress. For week of 11/1, crews will continue storm sewer and pavement removal. They will also begin building the new road base and concrete curb gutter in the medians.
10/22/2021 - New traffic pattern was executed today at the intersection of Aptakisic Rd and Buffalo Grove Rd. Traffic on Aptakisic Rd was shifted to the north half of the road and traffic on Buffalo Grove Rd was shifted to the west half of the road. Also, final striping was completed on Buffalo Grove Rd between Aptakisic Rd and IL22. On Monday 10/25 (weather dependent), crews will executing a new traffic pattern to allow contractors to work on the final stage of the project. Traffic on Aptakisic Rd and Buffalo Grove Rd will be moved to the outer lanes so crews can construct the medians.
10/15/2021 - A new traffic pattern for stage 2B construction is now in place. Traffic on Aptakisic Rd has been shifted to the north half of the road. Pavement construction on Buffalo Grove Rd just south of Aptakisic Rd is underway. Also, underground conduit installation in progress. For week of 10/18, crews plan on executing a new traffic pattern (stage 2C) early next week and another traffic pattern (stage 2D) later in the week at the intersection of Aptakisic Rd and Buffalo Grove Rd so please use caution.
10/7/2021 - A new traffic pattern has been executed and pavement construction at the intersection of Buffalo Grove Rd and Aptakisic Rd is in progress. Also, crews are working on traffic signal work at Thompson/Buffalo Grove Rd and sidewalk construction. For week of 10/11, crews will continue traffic signal work, sidewalk and pavement construction. Crews are also planning on executing a new traffic pattern next week so please use caution.
10/1/2021 - Asphalt paving for stage 2 is in progress. For week of 10/4, crews will be wrapping up stage 2 paving and plan to execute a new traffic pattern (stage 2A). Contractors will also work on stage 2A pavement construction on Buffalo Grove Rd just north of Aptakisic Rd, sidewalk construction, traffic signal work at Thompson/Buffalo Grove Rd, conduit work along Aptakisic Rd, and miscellaneous grading/clean up work behind the curb.
9/24/2021 - Asphalt paving on Buffalo Grove Rd and concrete curb/gutter work on Aptakisic Rd is in progress for stage 2 construction. For week of 9/27, crews will begin asphalt paving on Aptakisic Rd and continue curb and gutter work. Contractor will also be backfilling and doing miscellaneous clean up work behind the curb.
9/18/2021 - New road base construction and storm sewer installation at the northwest corner of Aptakisic Rd and Buffalo Grove Rd is in progress. Also, crews are currently working on grading the capping aggregate for the new road base on Buffalo Grove Rd in preparation for asphalt paving. For week of 9/20, the contractor will begin paving asphalt on Buffalo Grove Rd between Aptakisic Rd and Deerfield Pkwy. Crews will also be working on curb/gutter and storm sewer construction on Aptakisic Rd.
9/10/2021 - Concrete curb and gutter installation is in progress on the west side of Buffalo Grove Rd from Aptakisic Rd to Deerfield Parkway. Also, crews are working on subgrade excavation for the new road base and storm sewer installation on Aptakisic Rd. For week of 9/13, crews will work on curb/gutter installation, storm sewer and construct the new road base on Aptakisic Rd.
9/3/2021 - Subgrade excavation and PGE placement on Buffalo Grove Road for the new road base on Buffalo Grove is mostly complete, with placement of asphalt grindings as a top layer remaining. Storm sewer work continues on Aptakisic Rd including directional boring under the intersection of Buffalo Grove and Aptakisic. For week of 9/6, crews will finish prepping the new road base to allow the concrete curb and gutter subcontractor to begin work. Storm sewer installation will continue on Aptakisic Road.
8/26/2021 - Installation of storm sewer on Aptakisic Rd, subgrade excavation, and PGE placement for the new road base on Buffalo Grove Rd are in progress. Also, village watermain is currently being installed on the south side of Aptakisic Rd, west of Buffalo Grove Rd. For week of 8/30, crews will continue building the new road base, installing storm sewer, and beginning prep work for concrete curb and gutter installation on the west side of Buffalo Grove Rd (stage 2).
8/20/2021 - Storm sewer installation and pavement removal in progress. Also, the contractor is working on landscape restoration on the east side of Buffalo Grove Rd and north side of Aptakisic Rd. For week of 8/23, crews will continue storm sewer installation, pavement removal and subgrade excavation.
8/12/2021 - New Stage 2 traffic pattern will be in place by the end of day today. Traffic will transition onto the east half pavement of Buffalo Grove Rd and north side of Aptakisic Rd. Starting tomorrow, crews will begin removing the old pavement for the next stage of construction, building the west half of Buffalo Grove Rd and south half of Aptakisic Rd. Crews will also begin landscape restoration on the east side of Buffalo Grove Rd and north side of Aptakisic Rd. Next week (8/16), contractor will begin storm sewer installation and continue landscape restoration.
8/6/2021 - Asphalt paving for binder course stage 1 has been completed for the east half of Buffalo Grove Rd and north half of Aptakisic Rd. Curb/gutter and sidewalk construction is currently in progress. Also, traffic signal foundation work is underway at Thompson Blvd. For week of 8/9, crews will continue sidewalk construction and begin landscape restoration work for stage 1. On 8/11, crews plan on executing a new traffic pattern (stage 2) that will transition traffic onto the east half of Buffalo Grove Rd and north side of Aptakisic Rd. Once the new traffic pattern is in place, crews will begin constructing the west half of Buffalo Grove Rd and south half of Aptakisic Rd.
7/30/2021 - Asphalt paving is in progress on the east side of Buffalo Grove Rd and north side of Aptakisic Rd. Stage 1 paving should be completed by the weekend. For week of 8/2, crews will prep and work on replacing sidewalk in various locations. Also, the contractor is planning on executing a new traffic pattern (stage 2) towards the end of next week that will transition traffic onto the new pavement on the east half of Buffalo Grove Rd and north side of Aptakisic Rd. Once the new traffic pattern is in place, crews will begin constructing the west half of Buffalo Grove Rd and south half of Aptakisic Rd.
7/22/2021 - Storm sewer installation for stage 1 has been completed. Concrete curb & gutter placement is in progress and asphalt paving has started on Buffalo Grove Rd today.For week of 7/26, crews will continue asphalt paving for the east half of Buffalo Grove Rd and the north side of Aptakisic Rd.
7/15/2021 - Concrete curb and gutter construction is underway on the east side of Buffalo Grove Rd south of Aptakisic Rd. Storm sewer in progress on the north side of Aptakisic Rd just west of Buffalo Grove Rd. For week of 7/19, crews will continue curb construction and storm sewer installation. Also, the contractor may start paving towards the end of next week.
7/8/2021 - Box culvert construction on Aptakisic Rd just west of Buffalo Grove Rd has been completed. Crews are currently working on backfilling and rip rap installation for the box culvert and capping aggregate placement for the new road base on Aptakisic Rd. Contractor will begin prep work for concrete curb/gutter installation and plans to pour concrete curb next week. They will also begin storm sewer installation on the north side of Aptakisic Rd just west of Buffalo Grove Rd.
6/24/2021 - Placement of capping aggregate for the new road base on the east half of Buffalo Grove Rd and storm sewer installation on Aptakisic Rd is currently in progress. For week of 6/28, crews will continue storm sewer installation and resume construction for the last section of the box culvert on Aptakisic Rd. Also, contractor is planning to begin subgrade excavation on Aptakisic Rd and curb work on the east side of Buffalo Grove Rd between Aptakisic Rd and Deerfield Parkway. Please be cautious of potential flash floods on Buffalo Grove Rd between Aptakisic Rd and Deerfield Parkway during heavy rainfall from thunderstorms.
6/18/2021 - Stage 1 pavement removal on Aptakisic Rd has been completed. For week of 6/21, crews will begin storm sewer installation on Aptakisic Rd and place capping aggregate for the new road base on Buffalo Grove Rd between Deerfield Parkway and Aptakisic Rd. Also, contractor plans to finish pavement striping on Buffalo Grove Rd between Aptakisic Rd and IL22 in the next week or so.
6/10/2021 - A new traffic pattern was executed today on Aptakisic Rd to shift west bound traffic to the south side of the road between Didier Farms and Brandywyn Lane. The contractor will begin road reconstruction work for the north half of Aptakisic Rd and also complete the final phase (north section) of the box culvert installation. Pavement removal will begin tomorrow. For the week of 6/14, crews will continue pavement removal on the north half of Aptakisic Rd and resume box culvert construction.
6/3/2021 - New traffic pattern in place on Aptakisic Rd between Didier Farms and Brandywyn Ln. Crews are currently working on storm sewer installation on Buffalo Grove Rd south of Aptakisic Rd, and preparation work for the next phase (middle section) of box culvert construction on Aptakisic Rd just west of Buffalo Grove Rd. For week of 6/7, crews will begin the middle section of box culvert construction and continue storm sewer installation.
5/28/2021 - The Aptakisic Rd box culvert just west of Buffalo Grove Rd and aggregate road base construction on the east side of Buffalo Grove Rd south of Aptakisic Rd is in progress. For week of 5/31, crews will continue road base construction on the east side of Buffalo Grove Rd and begin temporary pavement construction in preparation for the next phase (middle) of the box culvert construction.
5/24/2021 - Landscape restoration along the bike path and pavement striping on Buffalo Grove Rd between Aptakisic Rd and IL22 is underway. Road base construction, storm sewer installation and box culvert construction is in progress on Buffalo Grove Rd between Aptakisic Rd and Deerfield Parkway. The week of 5/24, crews will continue work on the Aptakisic Rd box culvert, road base construction and storm sewer between Aptakisic Rd and Deerfield Parkway.
5/14/2021 - Crews are currently paving the final asphalt layer on Buffalo Grove Rd between Aptakisic and IL22. Box culvert construction, subgrade excavation for new road base, and storm sewer work is in progress between Aptakisic Rd and Deerfield Parkway. For week of 5/17, crews will continue work on the Aptakisic Rd box culvert, road base construction and storm sewer between Aptakisic Rd and Deerfield Parkway. Also, the contractor plans on landscaping work along the new bike path and striping pavement markings between Aptakisic Rd and IL22.
5/7/2021 - Bike path has been paved on the east side of Buffalo Grove Rd from Brandywyn to Churchill Park. Storm sewer installation south of Aptakisic Rd in progress. Next week (5/10), crews will begin paving the final asphalt layer on Buffalo Grove Rd between Aptakisic Rd and IL22. Also, the contractor will resume box culvert construction on Aptakisic Rd just west of Buffalo Grove Rd and continue storm sewer installation.
4/30/2021 - Storm sewer installation and pavement removal is underway between Deerfield Parkway and Aptakisic Rd. Landscape restoration, street light pole installation and bike path construction is in progress between Aptakisic Rd and IL22. Box culvert construction on Aptakisic Rd just west of Buffalo Grove Rd remains halted due to Com Ed utility conflicts. For week of 5/3, crews will continue landscape restoration, street light installation and bike path construction for the north section and storm sewer and pavement removal for the south section. Also, the contractor will pave the final asphalt layer between Aptakisic Rd and IL22 late next week.
4/19/2021 - Crews plan to execute a new traffic pattern this Wednesday (4/21), weather dependent. Travel lanes will be shifted to west side of Buffalo Grove Rd between Deerfield Parkway and Aptakisic Rd. Once the new traffic pattern is in place, the Contractor will begin road reconstruction work on the east side of Buffalo Grove Rd. Landscape restoration and street light work on Buffalo Grove Rd between Aptakisic Rd and IL22 is in progress. Box culvert construction on Aptakisic Rd just west of Buffalo Grove Rd remains halted due to Com Ed utility conflicts.
4/15/2021 - Crews are currently placing temporary pavement on Buffalo Grove Rd south of Aptakisic Rd. Once temporary pavement is completed, the contractor will put a new traffic pattern in place which will transition motorists to the west side of Buffalo Grove Rd between Deerfield Parkway and Aptakisic Rd. Next week (4/19), crews plan to begin tree planting, landscape restoration and installing street lights on Buffalo Grove Rd between Aptakisic Rd and IL22. Box culvert construction on Aptakisic Rd just west of Buffalo Grove Rd has been halted due to Com Ed utility conflicts.
4/1/2021 - Crews have completed the temporary traffic signal installation at the intersection of Aptakisic Rd and Buffalo Grove Rd. Tomorrow (4/2), the Contractor plans to execute a new traffic pattern on Aptakisic Rd between Brandywyn Ln and Didier Farms. The new traffic pattern will shift travel lanes to the north on Aptakisic Rd so crews can begin box culvert construction. Also, thru lanes will be narrowed down to one lane in each direction. For the week of 4/5, crews plan to begin constructing the south section of the box culvert. The culvert is located just west of Buffalo Grove Rd. Also, contractor plans to start excavation work for temporary pavement on the west side of Buffalo Grove Rd and medians between Aptakisic Rd and Deerfield Parkway.
3/29/2021 - Contractor has finished curb work between Aptakisic Rd and IL22. Crews will be scheduling tree planting and final landscape restoration soon. Silt fence installation has been completed between Aptakisic Rd and Deerfield Parkway. This week, crews will begin excavating for temporary pavement on the west side of Buffalo Grove Rd south of Aptakisic Rd.
3/12/2021 - Next week contractor will resume construction on Buffalo Grove Rd between Aptakisic Rd and Rt 22 to finish up items from last year. They will begin with concrete curb work followed by final landscape restoration, paving the final asphalt layer, pavement road striping and installing permanent street lighting. Also, road construction will begin on the south section of Buffalo Grove Rd between Aptakisic Rd and Deerfield Parkway. The contractor will be starting with tree removal work and silt fence installation beginning next week.
12/17/2020 - Winter ground stabilization has been completed. Contractor will continue to install electrical work and conduit during the winter months. The final asphalt layer, permanent pavement striping, street light installation, trees and final landscaping will be completed in spring 2021.
12/4/2020 - Pavement markings have been striped and all lanes are open. Daily lane closures will be set up to complete remaining items (landscaping, concrete sidewalk and miscellaneous clean up work). Crews are currently placing topsoil in preparation for landscape restoration work. Also, concrete sidewalk construction is in progress. Next week (12/7), contractor will be working on landscape restoration in the medians and west side of Buffalo Grove Rd from IL22 to Aptakisic Rd.
11/25/2020 - The new road base and concrete curb and gutter for the turn lanes has been completed. Crews are in the process of paving asphalt for the turn lanes and will be back to complete paving Friday. Next week (11/30), crews will re-stripe pavement markings to prepare for opening all lanes. If weather permits, the contractor will also work on landscape restoration and possibly resume sidewalk construction.
11/16/2020 - A new traffic pattern is now in place between Aptakisic Rd and IL22. Northbound traffic remains in its current lane while southbound traffic has been be shifted over to the west side of the road on the new pavement. The temporary street lighting on the west side of Buffalo Grove Rd has been completed and Stage 3 work is now underway, consisting of constructing the left turn lanes and center medians. Crews will work on sidewalk and driveway construction at Twin Groves school and Churchill Park entrances this week.
11/13/2020 - Crews are currently paving asphalt for the west half of Buffalo Grove Rd and should be completed by this weekend. Temporary street lighting and sidewalk construction is in progress. NOTE: There will be a new traffic pattern the week of 11/16 between Aptakisic Rd and IL22. Northbound traffic will remain in its current lane while southbound traffic will be shifted over to the west side of the road on the new pavement. Once the new traffic pattern is in place, crews will begin stage 3 work, which will consist of constructing the center medians.
11/6/2020 - Concrete curb and gutter placement and street light pole foundation installation is currently in progress on the west side of Buffalo Grove Rd. Next week (11/9), crews will finish curb and gutter placement, street light pole foundations and paving for stage 2 construction. Also, temporary street lighting on the west side of Buffalo Grove Rd should be completed.
10/29/2020 - Crews are currently fine grading the new aggregate road base in preparation for asphalt paving. Asphalt paving is scheduled to begin tomorrow for the west half of Buffalo Grove Rd starting at IL22 and working their way south. Next week, the contractor will continue pouring concrete for the new curb and gutter, fine grading the new road base and asphalt paving.
10/23/2020 - Concrete curb and gutter placement is currently in progress. Next week, crews will continue pouring curb, constructing the new road base and begin asphalt paving on the west half of Buffalo Grove Rd.
10/15/2020 - Storm sewer installation and construction of the new aggregate road base is currently in progress on the west side of Buffalo Grove Rd. For week of 10/19, crews will continue storm sewer and road base construction. Contractor to begin pouring concrete for the new curb and gutter later in the week.
10/8/2020 - Contractor has resumed stage 2 road work on Buffalo Grove Rd between Aptakisic Rd and IL22. Storm sewer installation is underway on the west side of Buffalo Grove Rd. Next week (10/12), crews will continue storm sewer installation and begin excavating/building the new road base.
9/25/2020 - Utility relocation work on the west side of Buffalo Grove Rd and on Aptakisic Rd is in progress. For the next couple of weeks, Nicor, Comcast and ComEd will continue their utility relocation work. Road work will resume when complete.
9/17/2020 - Concrete pavement removal is complete. Utility relocation work on the west side of Buffalo Grove Rd is in progress. Next week (9/21), Nicor gas, Comcast and ComEd will continue utility relocation work.
9/11/2020 - Removal of the old street lights has been completed. Pavement removal on the west side of Buffalo Grove Rd is in progress and will continue next week (9/14). Gas main relocation work on the west side of Buffalo Grove Rd between Satinwood and Churchill Park is in progress. ComEd and Comcast are working on utility relocations between Aptakisic Rd and IL22.
9/4/2020 - The new traffic pattern is now in place for stage 2 construction (building west half of Buffalo Grove Rd between IL22 and Aptakisic Rd). North and south bound traffic has been transitioned onto new pavement on the east half of Buffalo Grove Rd. Stage 2 construction is underway and crews are currently breaking/removing the old pavement and will begin taking down the old street lights on the west half of Buffalo Grove Rd. Work on removing old pavement will continue next week (9/7). Gas main relocation work on the west side of Buffalo Grove Rd between Brandywyn and Churchill Park is in progress. Also, Com Ed and Comcast are working on their relocation work on Buffalo Grove Rd between Aptakisic Rd and IL22.
8/28/2020 - Crews have completed pouring concrete for the new street light pole foundations and the installation of the temporary street lights should be completed by the end of the day today on the east side of Buffalo Grove Rd. The contractor has started doing some miscellaneous grading/clean up work and should begin restoration work behind the curb on Monday 8/31. Toward the middle of next week, they plan to execute the stage 2 traffic switch, moving north- and southbound traffic onto the new pavement (east half of Buffalo Grove Rd). Once traffic pattern has been switched, crews will begin removing the existing pavement and constructing the west half of Buffalo Grove Rd. Gas main relocation work on the west side of Buffalo Grove Rd between Brandywyn and Churchill Park is in progress. Also, ComEd is working on the east side of Buffalo Grove Rd near Brandywyn and on Aptakisic Rd. Comcast relocation work is also in progress between IL22 and Aptakisic Rd on the west side of Buffalo Grove Rd.
8/21/2020 - Sidewalk construction is underway on the east side of Buffalo Grove Rd between Aptakisic Rd and IL22. Crews are also working on conduit installation and pole foundations for the new street lighting. Gas main relocation work on the west side of Buffalo Grove Rd between Satinwood and Brandywyn is in progress, and ComEd is working on relocation work on the east side of Buffalo Grove Rd near Brandywyn and on Aptakisic Rd. Comcast relocation work started today and they will be working on the west side of Buffalo Grove Rd starting from IL22 and working their way south. Next week, (8/24), crews will continue work for the light pole foundations, install temporary street lighting and begin grading/clean up work behind the curb on the east side of Buffalo Grove Rd. Landscape restoration will begin once the grading work is completed. The contractor plans to execute the stage 2 traffic switch to move north- and southbound traffic onto the new pavement (east half of Buffalo Grove Rd) at the end of the month.
8/13/2020 - Asphalt paving for stage 1 has been completed. Crews have started light pole foundation work and will continue over the next week. Contractor will begin working on sidewalk replacement on the east side of Buffalo Grove Rd on Monday (8/17). Gas main relocation work on the west side of Buffalo Grove Rd between Aptakisic Rd and Birchwood Ln is in progress. Also, ComEd is working on their relocation work on the east side of Buffalo Grove Rd near Brandywyn and on Aptakisic Rd.
8/7/2020 - Contractor has completed stage 1 concrete curb placement and asphalt paving is currently in progress. Stage 1 paving should be completed early next week and crews will begin working on sidewalk replacement on the east side of Buffalo Grove Rd. Also, utility relocation work on the west side of Buffalo Grove Rd between Aptakisic Rd and Birchwood Lane is underway.
7/29/2020 - Concrete curb pour is currently underway for stage 1 construction on the east half of Buffalo Grove Rd and should be finished early next week. Asphalt paving is scheduled to begin late next week.
7/23/2020 - Crews are currently placing the capping aggregate (grindings) for the new road base and prep work for the new concrete curb and gutter on the east side of Buffalo Grove Rd. Utility work is in progress, and contractor will begin saw cutting and doing other prep work for sidewalk removal and replacement throughout various locations on the east side of Buffalo Grove Rd between Aptakisic Rd and IL22. Next week, contractor will begin pouring concrete for the curb.
7/17/2020 - Crews have completed stage 1 storm sewer work on the east side of Buffalo Grove Rd. The contractor started placing the capping aggregate (grindings) for the new road base and should be completed in the next several days. Next week (7/20), concrete curb work on the east side of Buffalo Grove Rd will begin.
7/10/2020 - Storm sewer work and excavating/building the new road base is underway for the Stage 1 construction (east half of Buffalo Grove Rd from Aptakisic Rd to IL22). Next week, crews will continue storm sewer installation and building the new road base. Also, the Contractor may start work for the new street lights on the east side of Buffalo Grove Rd.
7/2/2020 - Storm sewer work and excavating/building the new road base is underway for the Stage 1 construction (east half of Buffalo Grove Rd from Aptakisic Rd to IL22). Next week, crews will continue storm sewer installation and building the new road base.
6/25/2020 - Crews have completed breaking and removal of the existing pavement in the stage 1 work zone (east half of Buffalo Grove Rd) between Aptakisic Rd and IL22. Storm sewer work has started and will begin excavating/building the new road base Friday 6/26 and continuing next week, weather permitting. Access to Satinwood east is now open.
6/18/2020 - The stage 1 traffic pattern is now in place. Crews have started excavation work on the east side of Buffalo Grove Rd between Aptakisic Rd and IL22. Week of 6/22/20, the contractor will continue excavation work and begin storm sewer work for stage 1 construction.
6/12/2020 - The stage 1 traffic pattern switch has been delayed to next week due to wet ground conditions from earlier this week. Crews are currently working on paving the temporary pavement in the medians. Once the temporary pavement is completed, crews will begin preparation work for the stage 1 traffic switch.
6/5/2020 - Storm sewer installation and excavation work in the medians is in progress. Next week, crews will continue storm sewer installation and start paving temporary pavement in the medians. The contractor plans to execute the stage 1 traffic pattern toward the end of next week, weather permitting. This new traffic pattern will shift north bound traffic onto the west side of Buffalo Grove Rd, so the east half of the new pavement can be constructed.
5/28/2020 - Crews have completed temporary pavement construction on the west side of Buffalo Grove Rd from just south of IL22 to Aptakisic Rd. Tomorrow, southbound traffic will be shifted onto the new temporary pavement. Northbound traffic will remain in its current lane. This will allow pre-stage median work such as storm sewer installation and temporary pavement to be installed. Once median work is completed, northbound traffic be directed onto the west side of Buffalo Grove Rd, so the east half of the new pavement can be constructed.
5/22/2020 - Contractor has completed temporary pavement excavation on the west side of Buffalo Grove Rd. Asphalt paving for temporary pavement is currently in progress. Weather permitting, crews should finish paving temporary pavement next week for the pre-stage, and begin preparation work for the new traffic staging.
5/18/2020 - Construction signage, silt fence installation and tree removal operations have been completed between Aptakisic Rd and IL22. This week, crews will begin temporary pavement construction on the west side of Buffalo Grove Rd., beginning just south of IL22 and working southward.
5/5/2020 - Preliminary work starts this week on Buffalo Grove Rd between Aptakisic Rd and IL22. They will be installing construction signage and silt fence. Also began pre-stage work south of Aptakisic Rd for construction of a detention basin.