Washington St - From Haryan Way to Lake St

This project has an external dedicated website: Washington Street Thoroughfare Project

Limits: Starting just east of Haryan Way to Lake St in the Village of Grayslake.

Description: A new bridge will be installed to lower Washington St under the CN/Metra railroad tracks. The roadway will be reconstructed and widened to 5 lanes of concrete pavement. The project includes the installation of concrete walls, ornamental fencing, sidewalk, an asphalt bike path, a storm water pump station, and JAWA water main relocation. During construction, traffic on Washington St will be traveling on a temporary by-pass roadway. A full closure of Washington St with posted detour will be necessary for one weekend with dates TBD for 2016.

Progress Bar (Construction)

Current Information



This project has an external dedicated website: Washington Street Thoroughfare Project


  • More blahs
  • Stuff

Project Images

  1. Documents
  2. Contact Information
  3. Previous Updates
  4. Project FAQs