 | | COMPLETE SET OF .DGN FILES | COMPLETE SET | 5883 KB | 4/10/2012 1:36 PM |
 | | COMPLETE SET OF .PDF FILES | COMPLETE SET | 13742 KB | 4/10/2012 1:36 PM |
 | | MAINTENANCE LETTING DRAINAGE STRUCTURE DETAIL | Miscellaneous Tables | 102 KB | 4/10/2012 1:36 PM |
 | | MAINTENANCE LETTING DRAINAGE STRUCTURE DETAIL | Miscellaneous Tables | 127 KB | 4/10/2012 1:36 PM |
 | | TYPICAL TURN LANES and BYPASS LANE | Miscellaneous Tables | 69 KB | 4/10/2012 1:36 PM |
 | | TYPICAL TURN LANES and BYPASS LANE | Miscellaneous Tables | 48 KB | 4/10/2012 1:36 PM |
 | | FIVE LANE TO TWO LANE - DROP OR ADD | Miscellaneous Tables | 53 KB | 4/10/2012 1:36 PM |
 | | FIVE LANE TO TWO LANE - DROP OR ADD | Miscellaneous Tables | 36 KB | 4/10/2012 1:36 PM |
 | | RADIUS WITH TANGENT OFFSET - IN LIEU OF 3-CENTER CURVE | Miscellaneous Tables | 51 KB | 4/10/2012 1:36 PM |
 | | RADIUS with TANGENT OFFSET - IN LIEU OF 3-CENTER CURVE | Miscellaneous Tables | 29 KB | 4/10/2012 1:36 PM |
 | | TRENCH WIDTHS FOR TRENCH BACKFILL and PAVEMENT REPLACEMENT BITUMINOUS | Miscellaneous Tables | 61 KB | 4/10/2012 1:36 PM |
 | | TRENCH WIDTHS FOR TRENCH BACKFILL and PAVEMENT REPLACEMENT BITUMINOUS | Miscellaneous Tables | 226 KB | 4/10/2012 1:36 PM |
 | | DRAINAGE FACILITIES and EARTHERN BERM CONSTRUCTED ADJACENT TO HIGHWAY ROW | Miscellaneous Tables | 55 KB | 4/10/2012 1:36 PM |
 | | DRAINAGE FACILITIES and EARTHERN BERM CONSTRUCTED ADJACENT TO HIGHWAY ROW | Miscellaneous Tables | 35 KB | 4/10/2012 1:36 PM |
 | | UNDERCUT DETAIL | Earthwork, Landscaping And Erosion Control | 52 KB | 4/10/2012 1:36 PM |
 | | UNDERCUT DETAIL | Earthwork, Landscaping And Erosion Control | 34 KB | 4/10/2012 1:36 PM |
 | | TEMPORARY DITCH CHECK INSTALLATION FOR ROADWAY OR DRAINAGE DITCH | Earthwork, Landscaping And Erosion Control | 59 KB | 4/10/2012 1:36 PM |
 | | TEMPORARY DITCH CHECK INSTALLATION FOR ROADWAY OR DRAINAGE DITCH | Earthwork, Landscaping And Erosion Control | 100 KB | 4/10/2012 1:36 PM |
 | | PERIMETER EROSION BARRIER INSTALLATION | Earthwork, Landscaping And Erosion Control | 132 KB | 4/10/2012 1:36 PM |
 | | PERIMETER EROSION BARRIER INSTALLATION | Earthwork, Landscaping And Erosion Control | 69 KB | 4/10/2012 1:36 PM |
 | | DRY RUBBLE STONE OR BROKEN CONCRETE TREE WELLS | Earthwork, Landscaping And Erosion Control | 200 KB | 4/10/2012 1:36 PM |
 | | DRY RUBBLE STONE OR BROKEN CONCRETE TREE WELLS | Earthwork, Landscaping And Erosion Control | 125 KB | 4/10/2012 1:36 PM |
 | | SEGMENTAL CONCRETE BLOCK WALL | Earthwork, Landscaping And Erosion Control | 64 KB | 4/10/2012 1:36 PM |
 | | SEGMENTAL CONCRETE BLOCK WALL | Earthwork, Landscaping And Erosion Control | 35 KB | 4/10/2012 1:36 PM |
 | | CURB and GUTTER SUBGRADE OPTIONS | Subgrades, Subbases And Base Courses | 50 KB | 4/10/2012 1:36 PM |
 | | CURB and GUTTER SUBGRADE OPTIONS | Subgrades, Subbases And Base Courses | 45 KB | 4/10/2012 1:36 PM |
 | | TYPICAL 2 LANE SECTION | Surface Courses, Pavements, Rehabilitation And Shoulders | 55 KB | 4/10/2012 1:36 PM |
 | | TYPICAL 2 LANE SECTION | Surface Courses, Pavements, Rehabilitation And Shoulders | 54 KB | 4/10/2012 1:36 PM |
 | | TYPICAL 2 LANE SECTION with ADJACENT MULTI-USE PATH | Surface Courses, Pavements, Rehabilitation And Shoulders | 67 KB | 4/10/2012 1:36 PM |
 | | TYPICAL 2 LANE SECTION with ADJACENT MULTI-USE PATH | Surface Courses, Pavements, Rehabilitation And Shoulders | 66 KB | 4/10/2012 1:36 PM |
 | | TYPICAL 3 LANE SECTION | Surface Courses, Pavements, Rehabilitation And Shoulders | 56 KB | 4/10/2012 1:36 PM |
 | | TYPICAL 3 LANE SECTION | Surface Courses, Pavements, Rehabilitation And Shoulders | 53 KB | 4/10/2012 1:36 PM |
 | | TYPICAL 3 LANE SECTION with ADJACENT MULTI-USE PATH | Surface Courses, Pavements, Rehabilitation And Shoulders | 57 KB | 4/10/2012 1:36 PM |
 | | TYPICAL 3 LANE SECTION with ADJACENT MULTI-USE PATH | Surface Courses, Pavements, Rehabilitation And Shoulders | 60 KB | 4/10/2012 1:36 PM |
 | | TYPICAL 5 LANE SECTION - 11 FOOT LANES | Surface Courses, Pavements, Rehabilitation And Shoulders | 62 KB | 4/10/2012 1:36 PM |
 | | TYPICAL 5 LANE SECTION - 11 FOOT LANES | Surface Courses, Pavements, Rehabilitation And Shoulders | 61 KB | 4/10/2012 1:36 PM |
 | | TYPICAL 5 LANE SECTION - 12 FOOT LANES | Surface Courses, Pavements, Rehabilitation And Shoulders | 58 KB | 4/10/2012 1:36 PM |
 | | TYPICAL 5 LANE SECTION - 12 FOOT LANES | Surface Courses, Pavements, Rehabilitation And Shoulders | 61 KB | 4/10/2012 1:36 PM |
 | | TYPICAL INTERSECTION APPROACH with LEFT and RIGHT TURN LANES | Surface Courses, Pavements, Rehabilitation And Shoulders | 56 KB | 4/10/2012 1:36 PM |
 | | TYPICAL INTERSECTION APPROACH with LEFT and RIGHT TURN LANES | Surface Courses, Pavements, Rehabilitation And Shoulders | 60 KB | 4/10/2012 1:36 PM |
 | | TYPICAL INTERSECTION APPROACH with LT and RT TURN LANES and ADJACENT MULTI-USEPATH | Surface Courses, Pavements, Rehabilitation And Shoulders | 57 KB | 4/10/2012 1:36 PM |
 | | TYPICAL INTERSECTION APPROACH with LT and RT TURN LANES and ADJACENT MULTI-USEPATH | Surface Courses, Pavements, Rehabilitation And Shoulders | 69 KB | 4/10/2012 1:36 PM |
 | | TYPICAL SUPERELEVATED SECTION - 3R and RESURFACING PROJECTS | Surface Courses, Pavements, Rehabilitation And Shoulders | 53 KB | 4/10/2012 1:36 PM |
 | | TYPICAL SUPERELEVATED SECTION - 3R and RESURFACING PROJECTS | Surface Courses, Pavements, Rehabilitation And Shoulders | 63 KB | 4/10/2012 1:36 PM |
 | | TYPICAL SUPERELEVATED SECTION - NEW ROADS and RECONSTRUCTION PROJECTS | Surface Courses, Pavements, Rehabilitation And Shoulders | 54 KB | 4/10/2012 1:36 PM |
 | | TYPICAL SUPERELEVATED SECTION - NEW ROADS and RECONSTRUCTION PROJECTS | Surface Courses, Pavements, Rehabilitation And Shoulders | 66 KB | 4/10/2012 1:36 PM |
 | | TYPICAL SECTION AGGREGATE BIKEPATH | Surface Courses, Pavements, Rehabilitation And Shoulders | 46 KB | 4/10/2012 1:36 PM |
 | | TYPICAL SECTION AGGREGATE BIKEPATH | Surface Courses, Pavements, Rehabilitation And Shoulders | 29 KB | 4/10/2012 1:36 PM |
 | | TYPICAL SECTION 8 FOOT HOT-MIX ASPHALT BIKEPATH | Surface Courses, Pavements, Rehabilitation And Shoulders | 49 KB | 4/10/2012 1:36 PM |
 | | TYPICAL SECTION 8 FOOT HOT-MIX ASPHALT BIKEPATH | Surface Courses, Pavements, Rehabilitation And Shoulders | 41 KB | 4/10/2012 1:36 PM |
 | | TYPICAL SECTION 8 FOOT HOT-MIX ASPHALT BIKEPATH IN VICINITY OF CURB and GUTTER | Surface Courses, Pavements, Rehabilitation And Shoulders | 57 KB | 4/10/2012 1:36 PM |
 | | TYPICAL SECTION 8 FOOT HOT-MIX ASPHALT BIKEPATH IN VICINITY OF CURB and GUTTER | Surface Courses, Pavements, Rehabilitation And Shoulders | 47 KB | 4/10/2012 1:36 PM |
 | | TYPICAL SECTION 10 FOOT HOT-MIX ASPHALT BIKEPATH | Surface Courses, Pavements, Rehabilitation And Shoulders | 49 KB | 4/10/2012 1:36 PM |
 | | TYPICAL SECTION 10 FOOT HOT-MIX ASPHALT BIKEPATH | Surface Courses, Pavements, Rehabilitation And Shoulders | 41 KB | 4/10/2012 1:36 PM |
 | | TYPICAL SECTION 10 FOOT HOT-MIX ASPHALT BIKEPATH IN VICINITY OF CURB and GUTTER | Surface Courses, Pavements, Rehabilitation And Shoulders | 53 KB | 4/10/2012 1:36 PM |
 | | TYPICAL SECTION 10 FOOT HOT-MIX ASPHALT BIKEPATH IN VICINITY OF CURB and GUTTER | Surface Courses, Pavements, Rehabilitation And Shoulders | 47 KB | 4/10/2012 1:36 PM |
 | | TYPICAL MINOR ACCESS - PRIVATE ENTRANCE | Surface Courses, Pavements, Rehabilitation And Shoulders | 57 KB | 4/10/2012 1:36 PM |
 | | TYPICAL MINOR ACCESS - PRIVATE ENTRANCE | Surface Courses, Pavements, Rehabilitation And Shoulders | 102 KB | 4/10/2012 1:36 PM |
 | | TYPICAL MAJOR ACCESS - COMMERCIAL ENTRANCE | Surface Courses, Pavements, Rehabilitation And Shoulders | 55 KB | 4/10/2012 1:36 PM |
 | | TYPICAL MAJOR ACCESS - COMMERCIAL ENTRANCE | Surface Courses, Pavements, Rehabilitation And Shoulders | 94 KB | 4/10/2012 1:36 PM |
 | | TYPICAL MAJOR ACCESS - SIDE ROAD | Surface Courses, Pavements, Rehabilitation And Shoulders | 51 KB | 4/10/2012 1:36 PM |
 | | TYPICAL MAJOR ACCESS - SIDE ROAD | Surface Courses, Pavements, Rehabilitation And Shoulders | 38 KB | 4/10/2012 1:36 PM |
 | | HOT-MIX ASPHALT APRON FOR AGGREGATE FIELD ENTRANCE | Surface Courses, Pavements, Rehabilitation And Shoulders | 47 KB | 4/10/2012 1:36 PM |
 | | HOT-MIX ASPHALT APRON FOR AGGREGATE FIELD ENTRANCE | Surface Courses, Pavements, Rehabilitation And Shoulders | 31 KB | 4/10/2012 1:36 PM |
 | | TYPICAL MINOR ACCESS TREATMENT ON RESURFACING PROJECTS | Surface Courses, Pavements, Rehabilitation And Shoulders | 55 KB | 4/10/2012 1:36 PM |
 | | TYPICAL MINOR ACCESS TREATMENT ON RESURFACING PROJECTS | Surface Courses, Pavements, Rehabilitation And Shoulders | 47 KB | 4/10/2012 1:36 PM |
 | | TYPICAL MAJOR ACCESS TREATMENT ON RESURFACING PROJECTS | Surface Courses, Pavements, Rehabilitation And Shoulders | 56 KB | 4/10/2012 1:36 PM |
 | | TYPICAL MAJOR ACCESS TREATMENT ON RESURFACING PROJECTS | Surface Courses, Pavements, Rehabilitation And Shoulders | 48 KB | 4/10/2012 1:36 PM |
 | | MAILBOX TURNOUT ALONG UNCURBED ROADS | Surface Courses, Pavements, Rehabilitation And Shoulders | 59 KB | 4/10/2012 1:36 PM |
 | | MAILBOX TURNOUT ALONG UNCURBED ROADS | Surface Courses, Pavements, Rehabilitation And Shoulders | 56 KB | 4/10/2012 1:36 PM |
 | | MAILBOX TURNOUT ALONG CURBED ROADS | Surface Courses, Pavements, Rehabilitation And Shoulders | 55 KB | 4/10/2012 1:36 PM |
 | | MAILBOX TURNOUT ALONG CURBED ROADS | Surface Courses, Pavements, Rehabilitation And Shoulders | 56 KB | 4/10/2012 1:36 PM |
 | | CURB and GUTTER AT FLAT AREAS OF PAVEMENT | Surface Courses, Pavements, Rehabilitation And Shoulders | 48 KB | 4/10/2012 1:36 PM |
 | | CURB and GUTTER AT FLAT AREAS OF PAVEMENT | Surface Courses, Pavements, Rehabilitation And Shoulders | 36 KB | 4/10/2012 1:36 PM |
 | | CURB RAMPS with TRAFFIC SIGNAL POSTS and MAST ARMS | Surface Courses, Pavements, Rehabilitation And Shoulders | 117 KB | 4/10/2012 1:36 PM |
 | | CURB RAMPS with TRAFFIC SIGNAL POSTS and MAST ARMS | Surface Courses, Pavements, Rehabilitation And Shoulders | 161 KB | 4/10/2012 1:36 PM |
 | | CONCRETE WASHOUT FACILITIES | Earthwork, Landscaping And Erosion Control | 89 KB | 4/10/2012 1:36 PM |
 | | CONCRETE WASHOUT FACILITIES | Earthwork, Landscaping And Erosion Control | 76 KB | 4/10/2012 1:36 PM |
 | | TRANSITION FROM AGGREGATE SHOULDER TO B-6.24 FOR 16 FOOT OFFSET TO FACE | Surface Courses, Pavements, Rehabilitation And Shoulders | 55 KB | 4/10/2012 1:36 PM |
 | | TRANSITION FROM AGGREGATE SHOULDER TO B-6.24 FOR 16 FOOT OFFSET TO FACE | Surface Courses, Pavements, Rehabilitation And Shoulders | 32 KB | 4/10/2012 1:36 PM |
 | | TRANSITION FROM AGGREGATE SHOULDER TO B-6.24 FOR 18 FOOT OFFSET TO FACE | Surface Courses, Pavements, Rehabilitation And Shoulders | 55 KB | 4/10/2012 1:36 PM |
 | | TRANSITION FROM AGGREGATE SHOULDER TO B-6.24 FOR 18 FOOT OFFSET TO FACE | Surface Courses, Pavements, Rehabilitation And Shoulders | 33 KB | 4/10/2012 1:36 PM |
 | | TRANSITION FROM AGGREGATE SHOULDER TO B-6.24 FOR 20 FOOT OFFSET TO FACE | Surface Courses, Pavements, Rehabilitation And Shoulders | 55 KB | 4/10/2012 1:36 PM |
 | | TRANSITION FROM AGGREGATE SHOULDER TO B-6.24 FOR 20 FOOT OFFSET TO FACE | Surface Courses, Pavements, Rehabilitation And Shoulders | 32 KB | 4/10/2012 1:36 PM |
 | | TRANSITION FROM AGGREGATE SHOULDER TO B-6.12 | Surface Courses, Pavements, Rehabilitation And Shoulders | 51 KB | 4/10/2012 1:36 PM |
 | | TRANSITION FROM AGGREGATE SHOULDER TO B-6.12 | Surface Courses, Pavements, Rehabilitation And Shoulders | 29 KB | 4/10/2012 1:36 PM |
 | | HOT-MIX ASPHALT APRON FOR STRUCTURES IN AGGREGATE SHOULDERS | Surface Courses, Pavements, Rehabilitation And Shoulders | 56 KB | 4/10/2012 1:36 PM |
 | | HOT-MIX ASPHALT APRON FOR STRUCTURES IN AGGREGATE SHOULDERS | Surface Courses, Pavements, Rehabilitation And Shoulders | 46 KB | 4/10/2012 1:36 PM |
 | | HOT-MIX ASPHALT APRON FOR HANDHOLES IN AGGREGATE SHOULDERS | Earthwork, Landscaping And Erosion Control | 67 KB | 4/10/2012 1:36 PM |
 | | HOT-MIX ASPHALT APRON FOR HANDHOLES IN AGGREGATE SHOULDERS | Earthwork, Landscaping And Erosion Control | 41 KB | 4/10/2012 1:36 PM |
 | | TREE PRESERVATION WITH STORM SEWER IN UNCURBED AREAS | Bridges And Culverts | 298 KB | 4/10/2012 1:36 PM |
 | | TREE PRESERVATION WITH STORM SEWER IN UNCURBED AREAS | Bridges And Culverts | 109 KB | 4/10/2012 1:36 PM |
 | | TYPICAL PLACEMENT OF PRECAST END SECTIONS ON CROSSROAD CULVERTS | Bridges And Culverts | 65 KB | 4/10/2012 1:36 PM |
 | | TYPICAL PLACEMENT OF PRECAST END SECTIONS ON CROSSROAD CULVERTS | Bridges And Culverts | 30 KB | 4/10/2012 1:36 PM |
 | | JOINT TIES FOR CONCRETE PIPE | Bridges And Culverts | 220 KB | 4/10/2012 1:36 PM |
 | | JOINT TIES FOR CONCRETE PIPE | Bridges And Culverts | 116 KB | 4/10/2012 1:36 PM |
 | | RESTRICTED DEPTH MANHOLE | Incidental Construction | 50 KB | 4/10/2012 1:36 PM |
 | | RESTRICTED DEPTH MANHOLE | Incidental Construction | 31 KB | 4/10/2012 1:36 PM |
 | | INLET SPECIAL - STANDARD 542546 - DOUBLE - FLAT GRATES | Incidental Construction | 58 KB | 4/10/2012 1:36 PM |
 | | INLET SPECIAL - STANDARD 542546 - DOUBLE - FLAT GRATES | Incidental Construction | 71 KB | 4/10/2012 1:36 PM |
 | | INLET SPECIAL - STANDARD 542546 - DOUBLE - SLOPED GRATES | Incidental Construction | 59 KB | 4/10/2012 1:36 PM |
 | | INLET SPECIAL - STANDARD 542546 - DOUBLE - SLOPED GRATES | Incidental Construction | 75 KB | 4/10/2012 1:36 PM |
 | | SUB-SURFACE DRAINS | Incidental Construction | 76 KB | 4/10/2012 1:36 PM |
 | | SUB-SURFACE DRAINS | Incidental Construction | 199 KB | 4/10/2012 1:36 PM |
 | | RESTRICTORS FOR MEDIAN INLET BOX | Incidental Construction | 69 KB | 4/10/2012 1:36 PM |
 | | RESTRICTORS FOR MEDIAN INLET BOX | Incidental Construction | 44 KB | 4/10/2012 1:36 PM |
 | | SHOULDER BREAK AT TRAFFIC BARRIER TERMINAL - TYPE 1 SPECIAL - TANGENT with COMBINATION CURB and GUTTER | Incidental Construction | 64 KB | 4/10/2012 1:36 PM |
 | | SHOULDER BREAK AT TRAFFIC BARRIER TERMINAL - TYPE 1 SPECIAL - TANGENT with COMBINATION CURB and GUTTER | Incidental Construction | 107 KB | 4/10/2012 1:36 PM |
 | | SHOULDER BREAK AT TRAFFIC BARRIER TERMINAL - TYPE 1 SPECIAL - TANGENT | Incidental Construction | 64 KB | 4/10/2012 1:36 PM |
 | | SHOULDER BREAK AT TRAFFIC BARRIER TERMINAL - TYPE 1 SPECIAL - TANGENT | Incidental Construction | 108 KB | 4/10/2012 1:36 PM |
 | | SHOULDER BREAK AT TRAFFIC BARRIER TERMINAL - TYPE 1 SPECIAL - FLARED with COMBINATION CURB and GUTTER | Incidental Construction | 64 KB | 4/10/2012 1:36 PM |
 | | SHOULDER BREAK AT TRAFFIC BARRIER TERMINAL - TYPE 1 SPECIAL - FLARED with COMBINATION CURB and GUTTER | Incidental Construction | 68 KB | 4/10/2012 1:36 PM |
 | | SHOULDER BREAK AT TRAFFIC BARRIER TERMINAL - TYPE 1 SPECIAL - FLARED | Incidental Construction | 67 KB | 4/10/2012 1:36 PM |
 | | SHOULDER BREAK AT TRAFFIC BARRIER TERMINAL - TYPE 1 SPECIAL - FLARED | Incidental Construction | 65 KB | 4/10/2012 1:36 PM |
 | | TRAFFIC BARRIER TERMINAL - TYPE 1 SPECIAL - TANGENT | Incidental Construction | 82 KB | 4/10/2012 1:36 PM |
 | | TRAFFIC BARRIER TERMINAL - TYPE 1 SPECIAL - TANGENT | Incidental Construction | 70 KB | 4/10/2012 1:36 PM |
 | | TRAFFIC BARRIER TERMINAL - TYPE 1 SPECIAL - RADIAL | Incidental Construction | 56 KB | 4/10/2012 1:36 PM |
 | | TRAFFIC BARRIER TERMINAL - TYPE 1 SPECIAL - RADIAL | Incidental Construction | 61 KB | 4/10/2012 1:36 PM |
 | | GUARDRAIL LOCATION AND CLEARANCE NEAR TREES SPEED greater than 45 MPH | Incidental Construction | 54 KB | 4/10/2012 1:36 PM |
 | | GUARDRAIL LOCATION AND CLEARANCE NEAR TREES SPEED greater than 45 MPH | Incidental Construction | 48 KB | 4/10/2012 1:36 PM |
 | | ORNAMENTAL FENCE - CLASSIC TWO RAIL | Incidental Construction | 194 KB | 4/10/2012 1:36 PM |
 | | ORNAMENTAL FENCE - CLASSIC TWO RAIL | Incidental Construction | 112 KB | 4/10/2012 1:36 PM |
 | | ORNAMENTAL FENCE - THREE RAIL | Incidental Construction | 210 KB | 4/10/2012 1:36 PM |
 | | ORNAMENTAL FENCE - THREE RAIL | Incidental Construction | 116 KB | 4/10/2012 1:36 PM |
 | | ORNAMENTAL FENCE - THREE RAIL with RINGS | Incidental Construction | 219 KB | 4/10/2012 1:36 PM |
 | | ORNAMENTAL FENCE - THREE RAIL with RINGS | Incidental Construction | 122 KB | 4/10/2012 1:36 PM |
 | | BICYCLE RAILING | Incidental Construction | 108 KB | 4/10/2012 1:36 PM |
 | | BICYCLE RAILING | Incidental Construction | 179 KB | 4/10/2012 1:36 PM |
 | | BIKE PATH APPROACH GUARDRAIL ADJUSTMENT | Incidental Construction | 66 KB | 4/10/2012 1:36 PM |
 | | BIKE PATH APPROACH GUARDRAIL ADJUSTMENT | Incidental Construction | 39 KB | 4/10/2012 1:36 PM |
 | | WITNESS POST | Incidental Construction | 50 KB | 4/10/2012 1:36 PM |
 | | WITNESS POST | Incidental Construction | 35 KB | 4/10/2012 1:36 PM |
 | | MODIFIED STANDARD 701011 TWO LANE, TWO WAY, OFF-ROAD OPERATIONS DAY OPERATIONSONLY | Work Zone Traffic Control, Protection Signing and Pavement Marking | 214 KB | 4/10/2012 1:36 PM |
 | | MODIFIED STANDARD 701011 TWO LANE, TWO WAY, OFF-ROAD OPERATIONS DAY OPERATIONSONLY | Work Zone Traffic Control, Protection Signing and Pavement Marking | 75 KB | 4/10/2012 1:36 PM |
 | | MODIFIED STANDARD 701501 TWO LANE-TWO WAY - UNDIVIDED - LANE CLOSURE - DAY ORNIGHT OPERATIONS | Work Zone Traffic Control, Protection Signing and Pavement Marking | 129 KB | 4/10/2012 1:36 PM |
 | | MODIFIED STANDARD 701501 TWO LANE-TWO WAY - UNDIVIDED - LANE CLOSURE - DAY ORNIGHT OPERATIONS | Work Zone Traffic Control, Protection Signing and Pavement Marking | 108 KB | 4/10/2012 1:36 PM |
 | | MODIFIED STANDARD 701606 MULTILANE TWO WAY TRAFFIC - UNDIVIDED or MULTILANE TWOWAY TRAFFIC - DIVIDED WITH FLUSH MEDIAN - DAY OR NIGHT OPERATIONS | Work Zone Traffic Control, Protection Signing and Pavement Marking | 157 KB | 4/10/2012 1:36 PM |
 | | MODIFIED STANDARD 701606 MULTILANE TWO WAY TRAFFIC - UNDIVIDED or MULTILANE TWOWAY TRAFFIC - DIVIDED WITH FLUSH MEDIAN - DAY OR NIGHT OPERATIONS | Work Zone Traffic Control, Protection Signing and Pavement Marking | 189 KB | 4/10/2012 1:36 PM |
 | | MODIFIED STANDARD 701701 URBAN LANE CLOSURE MULTILANE INTERSECTION | Work Zone Traffic Control, Protection Signing and Pavement Marking | 124 KB | 4/10/2012 1:36 PM |
 | | MODIFIED STANDARD 701701 URBAN LANE CLOSURE MULTILANE INTERSECTION | Work Zone Traffic Control, Protection Signing and Pavement Marking | 160 KB | 4/10/2012 1:36 PM |
 | | MODIFIED DISTRICT 1 STANDARD TRAFFIC CONTROL AND PROTECTION FOR SIDEROADS, INTERSECTIONS AND DRIVEWAYS | Work Zone Traffic Control, Protection Signing and Pavement Marking | 84 KB | 4/10/2012 1:36 PM |
 | | MODIFIED DISTRICT 1 STANDARD TRAFFIC CONTROL AND PROTECTION FOR SIDEROADS, INTERSECTIONS AND DRIVEWAYS | Work Zone Traffic Control, Protection Signing and Pavement Marking | 126 KB | 4/10/2012 1:36 PM |
 | | TYPICAL LANE CLOSURE 3 LANE ROAD SECTION | Work Zone Traffic Control, Protection Signing and Pavement Marking | 105 KB | 4/10/2012 1:36 PM |
 | | TYPICAL LANE CLOSURE 3 LANE ROAD SECTION | Work Zone Traffic Control, Protection Signing and Pavement Marking | 99 KB | 4/10/2012 1:36 PM |
 | | DIRECTION INDICATOR BARRICADES | Work Zone Traffic Control, Protection Signing and Pavement Marking | 55 KB | 4/10/2012 1:36 PM |
 | | DIRECTION INDICATOR BARRICADES | Work Zone Traffic Control, Protection Signing and Pavement Marking | 53 KB | 4/10/2012 1:36 PM |
 | | TEMPORARY CONSTRUCTION INFORMATION SIGNS | Work Zone Traffic Control, Protection Signing and Pavement Marking | 95 KB | 4/10/2012 1:36 PM |
 | | TEMPORARY CONSTRUCTION INFORMATION SIGNS | Work Zone Traffic Control, Protection Signing and Pavement Marking | 98 KB | 4/10/2012 1:36 PM |
 | | MODIFIED MUTCD TYPICAL APPLICATION DIAGRAM TA-3 - SHOULDER CLOSURE and TAPER FORCHANGEABLE MESSAGE SIGNS | Work Zone Traffic Control, Protection Signing and Pavement Marking | 56 KB | 4/10/2012 1:36 PM |
 | | MODIFIED MUTCD TYPICAL APPLICATION DIAGRAM TA-3 - SHOULDER CLOSURE and TAPER FORCHANGEABLE MESSAGE SIGNS | Work Zone Traffic Control, Protection Signing and Pavement Marking | 50 KB | 4/10/2012 1:36 PM |
 | | WORK ZONE SPEED LIMIT SIGNING DIAGRAM | Work Zone Traffic Control, Protection Signing and Pavement Marking | 162 KB | 4/10/2012 1:36 PM |
 | | WORK ZONE SPEED LIMIT SIGNING DIAGRAM | Work Zone Traffic Control, Protection Signing and Pavement Marking | 129 KB | 4/10/2012 1:36 PM |
 | | TYPICAL PAVEMENT MARKINGS FOR COUNTY HIGHWAYS | Work Zone Traffic Control, Protection Signing and Pavement Marking | 195 KB | 4/10/2012 1:36 PM |
 | | TYPICAL PAVEMENT MARKINGS FOR COUNTY HIGHWAYS | Work Zone Traffic Control, Protection Signing and Pavement Marking | 333 KB | 4/10/2012 1:36 PM |
 | | ON STREET BICYCLE LANE PAVEMENT MARKING AND SIGNING DETAILS | Work Zone Traffic Control, Protection Signing and Pavement Marking | 109 KB | 4/10/2012 1:36 PM |
 | | ON STREET BICYCLE LANE PAVEMENT MARKING AND SIGNING DETAILS | Work Zone Traffic Control, Protection Signing and Pavement Marking | 142 KB | 4/10/2012 1:36 PM |
 | | SHORT TERM PAVEMENT MARKINGS | Work Zone Traffic Control, Protection Signing and Pavement Marking | 101 KB | 4/10/2012 1:36 PM |
 | | SHORT TERM PAVEMENT MARKINGS | Work Zone Traffic Control, Protection Signing and Pavement Marking | 93 KB | 4/10/2012 1:36 PM |
 | | TYPICAL PAVEMENT MARKINGS FOR RAILROAD CROSSINGS ON COUNTY HIGHWAYS | Work Zone Traffic Control, Protection Signing and Pavement Marking | 94 KB | 4/10/2012 1:36 PM |
 | | TYPICAL PAVEMENT MARKINGS FOR RAILROAD CROSSINGS ON COUNTY HIGHWAYS | Work Zone Traffic Control, Protection Signing and Pavement Marking | 152 KB | 4/10/2012 1:36 PM |
 | | SPECIAL DETAIL FOR ROUNDABOUTS SIGNING AND PAVEMENT MARKING | Work Zone Traffic Control, Protection Signing and Pavement Marking | 361 KB | 4/10/2012 1:36 PM |
 | | SPECIAL DETAIL FOR ROUNDABOUTS SIGNING AND PAVEMENT MARKING | Work Zone Traffic Control, Protection Signing and Pavement Marking | 307 KB | 4/10/2012 1:36 PM |
 | | COUNTER BOX INSTALLATION DETAIL | Electrical | 54 KB | 4/10/2012 1:36 PM |
 | | COUNTER BOX INSTALLATION DETAIL | Electrical | 36 KB | 4/10/2012 1:36 PM |
 | | TYPE C - SPECIAL - FOUNDATION for TRAFFIC SIGNAL CONTROLLER CABINET and UPS CABINET | Electrical | 54 KB | 4/10/2012 1:36 PM |
 | | TYPE C - SPECIAL - FOUNDATION for TRAFFIC SIGNAL CONTROLLER CABINET and UPS CABINET | Electrical | 50 KB | 4/10/2012 1:36 PM |
 | | TYPICAL DETECTOR LOOP LAYOUTS | Electrical | 52 KB | 4/10/2012 1:36 PM |
 | | TYPICAL DETECTOR LOOP LAYOUTS | Electrical | 33 KB | 4/10/2012 1:36 PM |
 | | VIDEO DETECTION DETAILS | Electrical | 128 KB | 4/10/2012 1:36 PM |
 | | VIDEO DETECTION DETAILS | Electrical | 104 KB | 4/10/2012 1:36 PM |
 | | TEMPORARY AUTOSCOPE INSTALLATION | Electrical | 82 KB | 4/10/2012 1:36 PM |
 | | TEMPORARY AUTOSCOPE INSTALLATION | Electrical | 60 KB | 4/10/2012 1:36 PM |
 | | WIRELESS ANTENNA - RADIO and POWER INJECTOR DETAIL | Electrical | 124 KB | 4/10/2012 1:36 PM |
 | | WIRELESS ANTENNA - RADIO and POWER INJECTOR DETAIL | Electrical | 103 KB | 4/10/2012 1:36 PM |
 | | IDOT - DIST 1 TRAFFIC SIGNALS | Electrical | 516 KB | 4/10/2012 1:36 PM |
 | | IDOT - DIST 1 TRAFFIC SIGNALS | Electrical | 467 KB | 4/10/2012 1:36 PM |